Bathroom Remodeling & Renovation Cost Guide

Real ranges for the work we do across the Piedmont Triad, Charlotte metro and southern Virginia — published so you can build a budget before anyone walks through your door. These are ranges, not quotes. Every STRYDE proposal is a written, line-item, fixed price.

Start here

What actually drives renovation cost

Four variables account for nearly all of the spread between a low quote and a high one. Understanding them is the difference between comparing prices and comparing scopes.

Size and square footage

The most predictable variable. A 40 sq ft hall bath and a 120 sq ft primary suite use the same trades, but material quantities, labor hours and demolition volume scale directly with the room.

Material selections

This is where two identical scopes end up $12,000 apart. Porcelain vs. natural stone, stock vs. custom cabinetry, framed vs. frameless glass, builder-grade vs. designer fixtures — the labor barely changes, the invoice does.

Scope: are you moving anything?

Keeping plumbing and electrical where they are is the single biggest cost lever available to you. Relocating a drain, moving a wall, or adding circuits brings in permits, inspections and additional trade days.

Labor complexity and site conditions

Plaster walls, cast-iron waste lines, unlevel subfloors, polybutylene supply, knob-and-tube remnants, second-story access, hillside lots. Older homes across the Triad, Charlotte and Virginia routinely carry one or more of these.
Bathroom Remodeling

Cost ranges by bathroom project

Ranges reflect completed projects in our service area, including labor, standard materials, demolition and debris removal.

Typical bathroom remodeling cost ranges by project type
ProjectTypical rangeTypical durationWhat moves the number
Tub-to-shower conversion$6,500$15,0005–10 daysStaying inside the existing tub footprint keeps plumbing changes minimal. Moving the drain adds cost.
Walk-in shower (new build-out)$8,500$22,0001–2 weeksDriven by waterproofing method, glass (framed vs. frameless), niche and bench work, and tile size.
Vanity & countertop upgrade$2,200$8,5002–4 daysStock vanity with quartz at the low end; custom cabinetry, double bowls and stone at the high end.
Bathroom tile & flooring$1,800$7,5002–5 daysSubfloor repair, uncoupling membrane and pattern complexity (herringbone, mosaic) move this range most.
Full bathroom remodel (hall / guest)$15,000$32,0003–5 weeksEverything down to studs and subfloor, layout kept. Relocating fixtures pushes toward the top.
Master / primary bathroom remodel$25,000$65,0004–8 weeksLarger footprint, double vanity, separate tub and shower, heated floors and higher-grade finishes.
Accessibility modifications$3,500$28,0003 days–3 weeksGrab bars and a comfort-height toilet at the low end; curbless roll-in shower with widened door at the high end.
Renovation Services

Cost ranges by renovation project

Some items price per square foot or per unit rather than per project — the middle column tells you which.

Typical renovation services cost ranges by project type
ProjectTypical rangePriced by / durationWhat moves the number
LVP or laminate flooring$4.50$10per sq ft installedIncludes removal of existing flooring, underlayment and transitions. Subfloor leveling is extra.
Hardwood flooring$9$22per sq ft installedEngineered at the low end; solid site-finished oak with stain and multiple topcoats at the high end.
Carpet installation$3$8per sq ft installedIncludes pad, tack strip and haul-away. Stairs are priced per tread, not by square foot.
Interior painting (per room)$450$1,4002–3 days per floorWalls only at the low end; walls, ceiling, trim and doors with patching and priming at the high end.
Exterior painting or staining$4,500$18,0001–2 weeksSquare footage, stories, siding material, and how much scraping, priming and carpentry repair is needed.
Interior door replacement$350$1,200per door installedSlab-only swaps at the low end; pre-hung units with new casing, hardware and paint at the high end.
Exterior door replacement$1,400$6,5001–2 days per openingFiberglass entry units, full flashing and trim. Sliding and French units sit at the upper end.
Window replacement$750$2,200per window installedInsert replacements are cheaper than full-frame. Wood rot repair at the opening is priced separately.
Exterior siding$12,000$45,0002–4 weeksVinyl at the low end, fiber cement at the high end. Wrap, trim and any sheathing repair are included in scope.
Roof repair / shingle replacement$450$3,500per repair / 1–3 daysLocalized leak repair, wind-torn shingle patches, and flashing fixes. Full replacement is a separate per-square scope.
Roof replacement (asphalt shingle)$9,000$28,000per 1,000 sq ft / 1–3 daysArchitectural shingles at the low end; luxury shingles, steep pitch, or decking replacement push the high end.

Ranges are estimates for planning purposes only, current as of 2026 and specific to the Triad, Charlotte metro and southern Virginia markets. They are not offers, quotes or guarantees of price. Material costs and lead times change. Your project is priced after an on-site consultation.

Detail

What affects your price

These are the factors that move a project within its range — or occasionally outside it.

Age of the home
Pre-1978 construction triggers federal lead-safe requirements — containment, specialized cleanup and documentation. We're EPA Lead-Safe Certified, and that work is real labor that belongs in the price rather than hidden.
Permits and inspections
Plumbing relocation, new circuits and structural changes are permitted work. Permit fees are modest; the schedule impact of inspection windows is the real cost.
What's behind the wall
We open exploratory areas during the consultation where we can, so surprises land in the proposal instead of as a change order in week two.
Fixture and finish availability
Special-order tile, custom vanities and non-stock windows carry lead times. A four-week lead time doesn't raise the price, but it does move your start date.
Structural or subfloor repair
Rotted subfloor under a leaking toilet flange, or joists cut for old plumbing runs, has to be corrected before finishes go down. We flag it and price it as its own line.
Accessibility requirements
Curbless entries, widened doorways and blocking for grab bars require framing and drain work that a standard remodel doesn't.
Access and staging
Narrow streets, hillside lots, stairs-only access, HOA rules on dumpster placement and work hours all add labor hours to the same nominal scope.
Season and scheduling
Exterior painting, siding and roofing are weather-dependent. Booking outside peak spring and fall windows often means a faster start date.
Restoration Services

Why restoration isn't priced on this page

Water mitigation, mold remediation and storm or roof damage are not flat-rate work, and publishing a range for them would mislead you. Cost depends on how far the water traveled, how many materials are affected, how many days of drying equipment are required, and what the moisture readings show on site — none of which can be known before an assessment. These losses are also most often handled through your homeowners insurance and billed to industry-standard claim pricing that your carrier and adjuster review, rather than to a menu price.

What we will tell you up front: we assess on site, document everything with photos and moisture readings for your carrier, and explain your deductible and coverage exposure before work is authorized.

Damage happening now?

24/7 response. Assessment and mitigation often start the same day.

Call 336-892-8181Restoration Services
No guesswork

Get a written, fixed price for your project

Ranges are useful. A measured, itemized quote is better — and it's free.

Payment Estimator

Estimate your monthly payment

Move the sliders to see what a project might look like as a monthly payment. These figures are illustrative — your actual rate, term and approval come from the lender, not from STRYDE Home.

$18,000
$3,000$75,000
Term
9.99%
Estimated monthly
$382/mo

60 payments · about $22,941 total at 9.99% APR.

Get My Free Quote

For illustration only. Not an offer of credit, a quote, or a guarantee of approval. Rates, terms and payments vary by lender, credit profile and project scope. All financing is provided by third-party lenders on approved credit.

Financing

You don't have to fund it all at once

Many of our clients finance part or all of a project through third-party lenders or their own bank. We'll walk you through how the options work and what the application process looks like — we're a contractor, not a lender, so terms and approval come from them.

Explore financing options
FAQ

Cost questions, answered straight

Are these prices quotes?

No. They're honest ranges based on the projects we actually complete across the Triad, Charlotte metro and southern Virginia, published so you can sanity-check a budget before you talk to anyone. Your number depends on your room, your selections and what we find behind the walls. Every STRYDE proposal is a written, line-item, fixed price for a defined scope — that's the number that counts.

Why is one contractor thousands cheaper than another for the same job?

Usually because the scopes aren't the same, even when they look the same on paper. Ask specifically: is the waterproofing system named and warrantied, is subfloor repair included or excluded, who pulls the permit, is debris removal in the price, is trim and paint included after the tile work, and what happens to the price if something is found in demolition. When you line those items up side by side, most of the gap explains itself.

How much of my budget should I hold back for surprises?

For a home built before 1980, plan on 10–15% held in reserve. For newer construction, 5–10% is usually enough. We price what we can see and document what we can't, but no one can guarantee the condition of a subfloor they haven't opened.

Does a fixed price mean the price can never change?

It means it can't change without your written approval. The contract price covers the defined scope. If you add a heated floor mid-project, or we uncover rotted framing, you get a written change order with the cost before any work proceeds — never a surprise on the final invoice.

Do you charge for the estimate?

No. The consultation and written proposal are free. If a project needs measured drawings or a detailed design package beyond a standard proposal, we'll tell you what that costs before we start it.

When do I pay?

Progress payments tied to defined milestones, with a deposit at contract signing to secure materials and your slot in the schedule. Final payment is due after the walkthrough and after the punch list is closed — not before.

Will a remodel raise my property value?

Bathroom remodels and flooring replacement are consistently among the better-returning residential projects, but return varies by neighborhood and by how far your finishes sit above local norms. We'll tell you candidly when a selection is a personal-enjoyment upgrade rather than a resale one.